New Beetle L5-2.5L (BPR) (2007)
-
Assemble bell - 2 -, hollow piston cylinder - 3 - with tie bolt and special nut - 4 -.
-
Pull out wheel hub while holding device securely.
1
Pressure bolt (E-15)
2
Bell (E-40)
3
Hollow piston cylinder ( HKZ-15)
4
Special nut (E-8-214) and tie bolt
5
High pressure hose with quick-release
Wheel Bearing, Removing
-
Remove securing ring.
-
Assemble thrust piece - 1 - with collar to wheel bearing, thrust sleeve - 2 - with four stepped inside diameters to wheel bearing housing, hollow
piston cylinder - 3 - with tie bolt and special nut - 4 -.
-
Pull out wheel bearing by actuating pump.
1
Thrust piece (E-5)
2
Thrust sleeve (E-65-1)
3
Hollow piston cylinder ( HKZ-15)
4
Special nut (E-8-214) and tie bolt
Bearing Inner Race, Removing from Hub