New Beetle L5-2.5L (BPR) (2007)
1
Footwell vent
2
Instrument panel support
3
Heater unit
-
Pull up pull-rod and place selector lever in "P" with pull rod pulled up.
-
Pull locking cable slightly out of cable sleeve and engage in locking lever - arrow C -.
-
Engage locking lever mounting bracket into selector housing - arrow B -.
-
Slide locking cable into steering lock => [ Locking Cable ] See: . Flattened side of locking cable points downward.
-
Connect clip - 2 - of locking cable - 3 -.