New Beetle L5-2.5L (BPR) (2007)
-
Install rubber sound insulation.
-
Install cover in upper part of center console.
-
Install complete air filter housing.
Function
‹› Shift lever must rest in 3rd/4th shift gate when transmission is in neutral.
-
Operate clutch.
-
Shift through all gears several times. Pay particular attention to function of reverse gear lock.
Should a gear fail to engage smoothly after repeated selection, shift rod play (lift) should be checked as follows:
-
Select 1st gear.
-
Push shift lever toward left until stop and release.
-
Simultaneously (2nd technician), observe shift rod on transmission.
-
When moving shift lever, shift rod must move approximately 1 mm in direction of - arrow -.
-
If this is not the case, adjust shift mechanism => [ Shift Mechanism, Adjusting ] See: Adjustments.