New Beetle Convertible L5-2.5L (BPR) (2007)
-
Guide the coolant pump - A - through between the longitudinal member and cylinder block and remove it.
Installing
Installation is performed in the reverse order of removal. When doing this note the following:
CAUTION!
When doing any repair work, especially in the engine compartment, pay attention to the following due to clearance issues:
‹› Route lines of all types (for example, fuel, hydraulic, Evaporative Emission (EVAP), coolant, refrigerant, brake fluid and vacuum)
and electrical wiring so that the original path is followed.
‹› To prevent damage to the lines, make sure there is sufficient clearance to all moving or hot components.
Note the installed position of coolant pump before installing.
-
Rotate the pulley so that the arrow - A - (relative to engine axis) points upward vertically. Holes in the pulley must align opposite the bolts -
arrows -.
-
First, firmly bolt the engine mount to the engine, then align the engine/transmission assembly free of tension via a shaking motion and tighten the
bolts to the subframe.
‹› Tightening specifications for the engine and transmission mounts. Refer to => [ Fastener Tightening Specifications ] See: Specifications/Engine
Assembly - Fastener Tightening Specifications.
-
Install the lock carrier.
-
Install the bracket for the reservoir and power steering line.