New Beetle Convertible L5-2.5L (BPS) (2006)
^
Open the valve on the supply side for 2 seconds to purge the air from the hose (fig. 7).
^
Open valve on air hose side.
Leave valve open for ten minutes.
^
Close the valve on the air hose side and open the valve on the supply side.
^
Leave valve open on reservoir side while monitoring the gauge.
^
Wait for the gauge to settle at it lowest point and close the valve.
^
Remove VAS 6096 from vehicle.
^
Adjust coolant level as necessary.
^
Allow engine to idle for 5 minutes and re-check heater temperature output.
Warranty