New Beetle Convertible L5-2.5L (BPS) (2006)
-
Switch off engine.
-
Remove ATF inspection plug from pan - arrow -.
-
Remove overflow tube - 1 - through inspection hole.
-
Drain ATF.
-
Install overflow tube.
-
Install plug hand-tight.
-
Add 3 liters of ATF through filler tube.
-
Start engine, shift through all selector lever positions with vehicle stationary, leaving selector lever in each position for about 10 seconds.
-
Finally, check ATF level and top off.