New Beetle GLS L4-1.8L Turbo (AWV) (2001)
Air Injection Pump: Testing and Inspection
With Generic Scan Tool
Secondary Air Injection (AIR) Pump Motor, Checking
Recommended special tools and equipment
-
VAG1526 multimeter or VAG1715 multimeter
-
VAG1594 connector test kit
-
Wiring diagram
Test requirements
-
The respective fuses of Secondary Air Injection (AIR) Pump Motor -V101- must be OK.
-
Fuel Pump (FP) Relay -J17- must be OK, check.
-
Secondary Air Injection (AIR) Pump Relay -J299- must be OK, check.
-
Battery voltage must be at least 11.5 volts.
-
All electrical consumers such as, for example, lights and rear window defroster must be switched off.
-
Ignition switched off.
Test sequence
-
Remove engine cover.
-
Disconnect 2-pin connector -1- from motor for secondary air pump -2-.
-
Disconnect pressure hose at Secondary Air Injection (AIR) pump motor.
NOTE: To disengage, compress the buttons at the hose coupling.