New Beetle GLS L4-2.0L (AVH) (2001)
3. Lightly tighten all bolts oil pan/engine block cross over.
4. Tighten three oil pan/transmission bolts
^
45 Nm (33 ft. lbs.)
5. Tighten all bolts oil pan/engine block cross over
^
15 Nm (11 ft. lbs.)
Note:
^
When installing the oil pan with the engine removed, ensure oil pan is Rush with engine block on flywheel side.
^
After installing the oil pan; allow the sealant to dry for approximately 30 minutes before filling with engine oil.
Assembly is the reverse of the disassembly procedure.
-
Fill engine oil.
-
Install lower insulation tray