Passat GLS 4Motion V6-2.8L (ATQ) (2002)
Air Injection Control Valve: Testing and Inspection
With Generic Scan Tool
Combination valves, checking
Recommended special tools and equipment
-
V.A.G 1390 Hand vacuum pump
Test requirements
-
No leaks in vacuum lines or hose connections.
-
Vacuum hoses not clogged or kinked
-
Pressure hose for Secondary Air Injection (AIR) Pump Motor not clogged or kinked
Test sequence
-
Disconnect vacuum hose of the combination valve to be checked at Y - piece (arrow).
-
Connect V.A.G 1390 hand vacuum pump to vacuum hose of the valve to be checked.
NOTE: Do not use pressurized air for the following test!
-
Remove front noise insulation.
-
Disconnect pressure hose (arrow) between Secondary Air Injection (AIR) Pump Motor and connecting line and blow into it with light pressure.
Both combination valves must be closed.