Engine Control Module: Service and Repair
ECM Voltage Supply Open Circuit, Follow-Up Procedure

Procedure After Interruption of Voltage Supply

If voltage supply has been interrupted, Engine Control Module (ECM) forgets all adaptation and basic setting values and erases the readiness code.
Depending on vehicle's mileage, this can cause substantial problems with running characteristics.

Special tools and equipment

-

V.A.G 1551 Scan Tool (or VAG 1552 mobile scan tool) with VAG 1551/3 cable

Procedure

Perform the following steps after an interruption in the voltage supply.

-

Switch ignition on for at least 10 seconds.

-

Switch ignition off.

-

Adapt Engine Control Module (ECM) to throttle valve control module.

-

Perform idle test.

NOTE:  During the idle test the solenoid valve for the activated charcoal cannister and the A/C system is turned off and the adaptation process of the
oxygen sensor control is performed.

-

Perform a longer road test, until problems with running characteristics are eliminated.

The following operating conditions must be obtained during road test:

-

Coolant temperature must rise to above 80 °C

-

Once the temperature is reached, the following conditions
Idle
Partial throttle
Wide Open Throttle (WOT)
Deceleration mode must be reached several times each.

-

Engine speed must be increased to above 3500 RPM during Wide Open Throttle (WOT).

ECM Voltage Supply Open Circuit, Follow-Up Procedure|Page 371 > < Engine Control Module (ECM) Voltage Supply, Checking|Page 368