volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Combination Valve, Checking|Page 3175 > < From 08.99|Page 3168
Page 1
background image

Air Injection Control Valve: Testing and Inspection
Combination Valve, Checking

Combination valves, checking

Recommended special tools and equipment

-

VAG1390 Hand Vacuum Pump

Test requirements

-

No leaks in vacuum lines or hose connections.

-

Vacuum hoses not clogged or kinked

-

Pressure hose for Secondary Air Injection (AIR) Pump Motor not clogged or kinked

Test sequence

-

Disconnect vacuum hose of combination valve to be checked:
-

Cylinder bank 1, item 3 ,

-

Cylinder bank 2, item 4 .

NOTE:

-

Cylinder bank 1 = in driving direction, right

-

Cylinder bank 2 = in driving direction, left

-

Connect hand vacuum pump to vacuum connection of combination valve (arrow).

NOTE:  Do not use pressurized air for the following test!

-

Remove front noise insulation.

-

Disconnect pressure hose (arrow) between Secondary Air Injection (AIR) Pump Motor and connecting line and blow into it with light pressure.
Both combination valves must be closed.

NOTE:  To disengage, compress the buttons at the hose coupling.

-

Operate hand vacuum pump.
The respective combination valve must open.

If the combination valve does not open or it is constantly open:

-

Replace the respective combination valve:
-

Cylinder bank 1, item 3 ,

-

Cylinder bank 2, item 4 .

-

Erase DTC memory of Engine Control Module (ECM), Diagnostic mode 4: Reset/erase diagnostic data.

-

Generate readiness code.  See: Computers and Control Systems/Testing and Inspection/Monitors, Trips, Drive Cycles and Readiness Codes

Combination Valve, Checking|Page 3175 > < From 08.99|Page 3168