-
‒ →
When installing the engine mounting ensure that the bonded rubber bush pins locate in the engine mounting -arrows-.
-
‒ Renew pointed bolt for securing shift finger (clean threads in shift finger).
-
‒ Installing P.A.S. vane pump:
=> Running gear; Repair group 48; Assembly overview: vane pump, reservoir, hydraulic lines; Removing and installing power steering vane pump.
=> 5-Speed manual gearbox 085; Repair group 30; Servicing clutch mechanism; Removing and installing clutch cable.
-
‒ Install lock carrier with attachments:
=> General body repairs; Repair group 50; Body, front; Removing and installing lock carrier with attachments.
Vehicles with air conditioner:
-
‒ Install air conditioner compressor:
=> Heating, air conditioner system; Repair group 87
-
‒ Electrical connections and routing:
=> Current flow diagrams, Electrical fault finding and Fitting locations
-
‒ Secure all pipes and hoses with cable ties and clips again. When doing this note coloured markings.
-
‒ Fill with coolant
-
‒ Adjust throttle cable => Page 20-22
-
‒ Check and if necessary adjust ignition timing:
=> Repair group 28; Injection and ignition system; Checking and adjusting ignition timing.
=> Repair group 24; Injection and ignition system; Performing basic setting
-
‒ Match engine electronics control unit to immobilizer:
=> Repair group 24; Injection and ignition system; Matching engine electronics control unit to immobilizer.
|