volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Checking full throttle stop valve > < Checking load signal potentiometer
Diesel injection and glow plug system
Servicing fuel injection system
Checking commencement of injection valve

Special tools, testers and auxiliary items

  • ◆ Hand multimeter V.A.G 1526
  • ◆ Adapter set V.A.G 1594

Test sequence

  • ‒ Separate multi-pin connector.
 
N23-0038
  • ‒ → Unclip connector -1- from retainer.
 
N23-0135
  • ‒ → Measure resistance of valve -1-at contact 18 of multi-pin connector -2- and vehicle earth.
         Specification: 14...17 ω(at approx. 20 °C)

=> Current flow diagrams, Electrical fault finding and Fitting locations binder

If the specification is not attained:

  • ‒ Renew injection pump =>Page 23-14 .

Checking full throttle stop valve > < Checking load signal potentiometer