During spot-weld bonding, in a case of repair, the whole extension
of welding and bonding spots is replaced, as during series production. |
In case of welding problems, for example, if on one 3-point
panel joint only the external panel is replaced, the repair spot welds
must be welded over the„old“ spot welds. |
|
|
|