Installation is carried out in the reverse order. When installing, note the following: |
Caution When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions: |
t
| Route all the various lines (e.g. for fuel, hydraulics, active charcoal filter system, coolant, refrigerant, brake fluid and vacuum) and electrical wiring in their original positions. |
t
| To avoid damage to lines, ensure sufficient clearance to all moving or hot components. |
|
Vehicles with manual gearbox |
–
| Check clutch release bearing for wear and renew if necessary. |
–
| Lightly grease clutch release bearing, release bearing guide sleeve and splines on input shaft with G 000 100. |
Vehicles with automatic gearbox |
–
| Only use nuts approved in parts programme to secure torque converter to drive plate. |
Continuation for all vehicles |
–
| Check whether dowel sleeves for centring engine and gearbox are in cylinder block and install if necessary. |
|
|
|