Polo Mk5
Installing |
Carry out following work: |
– | Push guide rails -1- into assembly carrier -2-, keeping them parallel to each other. |
– | Fit guide rails -1- on assembly frame at rear. |
– | Fit all bolts -2, 3 and 4- and tighten them slightly. |
– | Align guide rails -1- in accordance with the marking made previously -6-. |
– | Tighten bolts firmly. |
t | Specified torque for bolts -2-: 2 Nm |
t | Specified torque for bolts -3-: 3 Nm |
t | Specified torque for bolts -4-: 3.5 Nm |
– | Further installation is performed in the reverse order of removal. |