volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Checking changeover for exhaust gas recirculation cooler > < Exhaust gas recirculation system
Assembly overview - parts of exhaust gas recirculation system
   
Assembly overview - parts of exhaust gas recirculation system
1 - Bolt
q   9 Nm
2 - Exhaust gas recirculation pipe
q   With flexible joint; do not bend flexible joint - danger of cracking.
3 - Bolt
q   9 Nm
4 - Gasket
q   Renew.
5 - Vacuum line
q   Do not alter shape
q   Vacuum hose schematic diagram → Chapter.
6 - Bolt
q   9 Nm
7 - Gasket
q   Renew.
8 - Exhaust gas recirculation pipe
q   With flexible joint; do not bend flexible joint - danger of cracking.
9 - Bolt
q   9 Nm
10 - Clip
q   4 Nm
11 - Exhaust gas recirculation cooler
q   With integrated exhaust gas recirculation valve -N18- with exhaust gas recirculation potentiometer -G212-.
q   Checking changeover → Chapter.
q   Removing and installing → Chapter
12 - Bolt
q   9 Nm
13 - Gasket
q   Renew.
14 - Gasket
q   Renew.
15 - Exhaust gas recirculation pipe
q   With flexible joint; do not bend flexible joint - danger of cracking.
16 - Nut
q   22 Nm
17 - Bolt
q   9 Nm
18 - Gasket
q   Renew.

   

Checking changeover for exhaust gas recirculation cooler > < Exhaust gas recirculation system