–
| Disconnect electrical connector -2- and
free electrical wiring. |
–
| Place drip tray for workshop crane -VAS
6208- beneath engine. |
–
| Clamp off coolant hoses with hose clamps -3094- and remove from right coolant pipes, releasing hose clips -1, 3- to do so. |
–
| Undo bolts -arrows- and remove coolant
pipes on right. |
Installation is carried out in the reverse order; note the
following: |
Note
|
|
|