Polo Mk5
Assembly overview - exhaust gas purification system (Polo) |
1 - | Lambda probe -G39-, 50 Nm |
q | Grease only the threads with „G 052 112 A3“; „G 052 112 A3“ must not get into the slots on the probe body. |
q | Remove and install with Lambda probe open ring spanner set -3337-. |
2 - | 23 Nm |
q | Renew. |
q | Coat studs of turbocharger with high-temperature paste. |
3 - | Catalytic converter with exhaust pipe |
q | With decoupling element. |
q | Do not bend decoupling element more than 10° - otherwise it can be damaged. |
q | Remove and install → Chapter |
4 - | Gasket |
q | Renew. |
5 - | Mounting |
6 - | Clamp |
q | Mounting position and specified torque → Chapter |
q | Tighten bolted connections evenly. |
7 - | Mounting |
8 - | Gasket |
q | Renew. |
9 - | Stage 1: 18 Nm, stage 2: 12 Nm, stage 3: 12 Nm |
q | Renew. |
Caution
|
q | Specified torque for stud in cylinder head: 18 Nm (oil before inserting). |
10 - | 20 Nm |
11 - | Bracket |
12 - | Turbocharger |
q | With charge air controller -V465- |
q | Remove and install → Chapter |
Note
Turbocharger can only be renewed complete with exhaust manifold and charge air controller -V465-. |
13 - | Heat shield |
14 - | 10 Nm |
q | First tighten all securing bolts by hand when installing. |
15 - | Heat shield |
16 - | 10 Nm |
q | First tighten all securing bolts by hand when installing. |
17 - | 10 Nm |
q | First tighten all securing bolts by hand when installing. |
18 - | Lambda probe after catalytic converter -G130- |
q | Specified torque: 50 Nm |
q | Grease only the threads with „G 052 112 A3“; „G 052 112 A3“ must not get into the slots on the probe body. |
q | If seal is leaking, nip open and renew. |
19 - | 10 Nm |
q | First tighten all securing bolts by hand when installing. |
20 - | 25 Nm |