Quantum L4-1715cc 17L SOHC (1983) Dashboard Component Information
- Remove two nuts (arrow) from plenum chamber.
- Remove instrument panel.
°
Arrows indicate securing points for instrument panel onto body.
Instrument Panel, Installing
Proceed in reverse order of removing and note following:
- Make sure that sealing washers 6 between instrument panel and body are in correct position before installing instrument panel.