volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Convertible Top - Eliminating Leaks|Page 4943 > < Convertible Top - Eliminating Leaks|Page 4941
Page 4
background image

-

close top and align roof frame seal so that forward end is flush and parallel with header seal (arrow)

-

drill a 3 mm hole through roof frame seal into roof frame (arrow)

-

pull seal off roof frame for a length of approx. 55 mm (2-1/4 in.) and seal contact surface in frame with sealant, Part No. AMV 176 000 05

-

reinstall seal

-

secure roof frame seal with screw

Labor operation - 61 45 21 0
T.U.

- 160
(replacement of entire seal set)

Convertible Top - Eliminating Leaks|Page 4943 > < Convertible Top - Eliminating Leaks|Page 4941