volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

A/C - System Flushing Information|Page 438 > < A/C - System Flushing Information|Page 436
Page 5
background image

^

The flush program will begin with an evacuation of the system and a rate of rise test. This is necessary to test the integrity of the connections
before the flush cycles begin. If the rate of rise test passes, the program will proceed into the flush cycles. These cycles will occur automatically
in succession. See Figures 5 - 7.

^

The debris is then rinsed from the circuit and contained within the filtration in the flusher. After the flush program, the system will be evacuated.

5. After the system is evacuated, remove any adapters that were installed from the VAS 6338/1.

6. Replace Expansion Valve (if equipped), Receiver-drier and Restrictor (if equipped).

7. Connect the station in the usual manner through the service fittings and perform the normal evacuation and refrigerant recharge operations.

8. Print a log of the job and attach to the repair order.

Touareg with Four Zone Climate Control - Rear A

For Touareg with four zone climate control, the flush process will be repeated for the additional air conditioning unit (rear of vehicle) according to the
repair information in ElsaWeb.

1. Separate the front and rear air conditioning Systems for individual rinse operations.

The VAS 6338/1 contains the necessary adapters to separate the systems for the individual rinse operations.

A/C - System Flushing Information|Page 438 > < A/C - System Flushing Information|Page 436