240 L4-2127cc 2.1L SOHC Turbo B21FT FI (1982)
4. Push on two 50 mm (2 in) pieces of insulation tubing.
5. Use tape to tie the wires to the gear lever, as shown.
6. Attach two spade connectors to the wire ends.
7. Loop the wires to permit maximum flexibility. Attach to the connector. It must be in the front left corner.
8. Reinstall the rubber bellow.
Oil Level Checking