240 L6-2383cc 2.4L DSL SOHC D24 FI (1982)
6. Assemble rear and front housing.
NOTE: Gasket between brake drum and rear housing.
Torque the nuts crosswise to 7-16 Nm 5-12 ft lb).
NOTE: The two upper studs have nylon seals. The narrow end toward the housing.
7. Install the bridges and tighten the nuts to 7-16 Nm (5-12 ft lb).
8. Install solenoid and ground wire. Torque the solenoid to 42-55 Nm (30-40 ft lb).