volvo Workshop Repair Guides

Volvo Workshop Service and Repair Manuals

Transmission Cooler, A/T > < Throttle Valve Cable (Kickdown Cable) <--> [Throttle Valve Cable/Linkage, A/T]|Service and Repair|Page 4138
Page 3
background image

Replace knee bolster. Torque to 20 Nm (15 ft. lbs).

Reinstall sound insulation pad

Q6

Reinstall connector on kickdown switch

Reinstall locking clip on cable tensioner

Make sure cable is positioned correctly in the engine compartment.

Firmly latch cable onto throttle control pulley

Insert a 3.5 mm (0.14") spacer between the throttle pulley idle stop and the bmcket stop.

Make sure locking clip is positioned firmly against bracket. Adjust cable until it is under light tension.

Q7

Remove spacer

Remove locking clip and replace cable tensioner in bracket with locking clip

Reinstall cover

Q8

Check that DTCs have been cleared.

See section On-board Diagnostic System, Diagnostic Test Mode 1. See: Testing and Inspection

Transmission Cooler, A/T > < Throttle Valve Cable (Kickdown Cable) <--> [Throttle Valve Cable/Linkage, A/T]|Service and Repair|Page 4138