volvo Workshop Repair Guides

Volvo Workshop Service and Repair Manuals

Draining Refrigerant, Vacuum-Pumping, and Filling|Page 12229 > < Draining Refrigerant, Vacuum-Pumping, and Filling|Page 12227
Page 3
background image

The high pressure side's (HP) service valve is concealed under the cover above the air conditioning aggregate. (See refrigerant draining above). During
vacuum pumping, the vacuum pump can be connected to the service valves for both the high pressure (HP) and low pressure (LP) sides. Vacuum pump
system for at least 50 minutes. The vacuum must be checked after vacuum pumping. Carry out Refrigerant filling in direct connection with vacuum
pumping, see below.

Refrigerant, filling

Only fill refrigerant on the low pressure side's (LP) service valve (Orifice system). A specification decal in the engine compartment indicates how much
refrigerant the A/C system holds.

Leak trace with electronic leak tracer. Refer to: Leak tracing, electronic leak tracer See: Testing and Inspection/Component Tests and General
Diagnostics/Leak Tracing, Electronic Leak Tracer 
Or with tracing agent/UV lamp.  Refer to: Leak detection, tracer agent See: Testing and Inspection/Component Tests and General Diagnostics/Leak
Detection, Tracer Agent 

Draining Refrigerant, Vacuum-Pumping, and Filling|Page 12229 > < Draining Refrigerant, Vacuum-Pumping, and Filling|Page 12227