volvo Workshop Repair Guides

Volvo Workshop Service and Repair Manuals

Paint Repairs To the Bottom Swell|Page 10669 > < Paint Repairs To the Bottom Swell|Page 10667
Page 28
background image

Spray base metallic paint first layer with normal flow.

Allow base metallic paint dry 
Allow base metallic paint dry to a matt surface.

Note! Risk of patches if the drying time is too short. 

Spray base metallic paint 2nd coat 
Spray base metallic paint second coat with reduced flow (dry).
Increase spray stand. Base metallic coat should achieve 10-20 micron coat thickness after the second coat was applied. (If the second coat is sprayed
with greater flow the shade will be more strongly colored than if a thin coat was sprayed.)

Allow base metallic paint air dry 
Allow the base metallic to air dry (airing) for approximately 15 minutes until a matt surface is obtained.

Note! If the base metallic paint is not completely dry when the varnish is applied there is a risk that paint will be patchy. 

Spray varnish 
Spray on varnish (two part) with good flow in two coats.
Wait 3-4 minutes between every coat.
Coat thickness 40-45 micron.

Allow the varnish to dry 
Drying time/surface temperature:
12 hours/20°C (68°F)

Drying varnish with heat lamp or hot air gun 

Paint Repairs To the Bottom Swell|Page 10669 > < Paint Repairs To the Bottom Swell|Page 10667