S40 L4-1.9L Turbo VIN 29 B4204T3 (2001)
Finishing
Install the cable harness. Connect the connectors to the solenoids.
Install the oil temperature sensor with the holder and the screw. Note that the length of the screw is given in mm. Tighten to 10 Nm.
Install the cable harness on the holder. Check that the cable harness is correctly positioned.
Reinstall according to Replacing the cable harness for the control system, AW55-50/51SN See: Wiring Harness/Service and Repair.