volvo Workshop Repair Guides

Volvo Workshop Service and Repair Manuals

Shift Lever Housing <--> [Shifter A/T] > < Shift Solenoid, A/T|Locations|Page 5522
Page 5
background image

Finishing

Install the cable harness. Connect the connectors to the solenoids.
Install the oil temperature sensor with the holder and the screw. Note that the length of the screw is given in mm. Tighten to  10 Nm.
Install the cable harness on the holder. Check that the cable harness is correctly positioned.
Reinstall according to  Replacing the cable harness for the control system, AW55-50/51SN See: Wiring Harness/Service and Repair.

Shift Lever Housing <--> [Shifter A/T] > < Shift Solenoid, A/T|Locations|Page 5522