volvo Workshop Repair Guides

Volvo Workshop Service and Repair Manuals

Cylinder Head Gasket|Service and Repair|Page 4051 > < Cylinder Head Gasket|Service and Repair|Page 4049
Page 16
background image

Install:

-

the screw holding the inner timing cover to the cylinder head

-

the thermostat housing and cable duct. Use a new gasket

-

the screw for the thermostat housing cable duct.

Checking the tensioner pulley and idler pulley

Spin the idler pulley and listen for noise. If replacing with a new idler pulley, tighten to 24 Nm.
Spin the tension pulley and listen for noise. When replacing, screw the tension pulley into place using the center screw.
Screw in the center screw by hand.
Ensure that the tensioner fork is centered over the cylinder block rib / bracket.
Ensure that the Allen hole on the eccentric is at "10 o'clock".

Checking the variable valve timing (VVT) unit

Check the variable valve timing (VVT) unit. See: Variable valve timing unit, checking and adjusting See: Actuators and Solenoids - Engine/Variable
Valve Timing Actuator/Adjustments.

Installing components

Install:

-

the trigger wheel

-

the camshaft position (CMP) sensor housing

-

the pipe screw for the water heated crankcase ventilation at the rear of the cylinder head. Use new seal washers. Tighten to 26 Nm.

Cylinder Head Gasket|Service and Repair|Page 4051 > < Cylinder Head Gasket|Service and Repair|Page 4049