volvo Workshop Repair Guides

Volvo Workshop Service and Repair Manuals

Cylinder Head Gasket|Service and Repair|Page 4052 > < Cylinder Head Gasket|Service and Repair|Page 4050
Page 17
background image

Install:

-

the ignition coils according to the earlier markings

-

the connector for the coolant temperature sensor

-

the connectors for the variable valve timing solenoids

-

the screws for the two ground terminals between ignition coils 1 and 2 and 5 and 6.

Install below the intake manifold:

-

the starter motor

-

the throttle body (TB) connector to the engine wiring

-

the charge air pipe to the throttle body (TB). Tighten the clamp

-

the control hose to the charge air by-pass valve

-

the brake vacuum hose to the intake manifold

-

the bracket and screw to the lower row of screws at the mounting for the intake manifold on the cylinder head

-

the pipe screws at the underside of the intake pipe for the water heated crankcase ventilation. Tighten to 26 Nm.

-

the dipstick pipe onto the intake manifold.

Installing the fuel rail

Install:

-

the fuel rail. Use new screws. Tighten to 10 Nm. Press the quick-release connector for the fuel pressure line until it clicks, see also Fuel line, lock 
See: Powertrain Management/Fuel Delivery and Air Induction/Fuel Rail/Service and Repair.

-

the clamps holding the injector wiring and the positive cable to the rear edge of the cylinder head

Cylinder Head Gasket|Service and Repair|Page 4052 > < Cylinder Head Gasket|Service and Repair|Page 4050