S90 L6-2.9L VIN 96 B6304S (1998)
AT5. Transfer hexagonal studs to new modulator
Ensure that rubber dampers are intact. Press dampers onto studs.
Mount modulator in position and tighten support bracket. Remove plugs in brake pipe connections on new unit.
Note: Reconnect brake pipes as per markings, taking great care to ensure that connections are correct. See schematic above.
AT6. Remove cloth waste and clean area thoroughly
AT7. Install/reconnect:
^
relays
^
connector
^
ground lead
^
cover over modulator