Valve assembly

1

Position the plug (1) on the underside of the valve connection.
Partially remove the two locking tabs from the tie strap (2) as illustrated.
Install the tie strap (2) on the valve as indicated in the drawing. Secure the tie strap.
Connect the vacuum hose (3) to the valve.

Installing the T-piece

2

If necessary remove the cover for the throttle housing.
Cut the hose (A) at 60 mm.
Cut (B) 10 mm from the existing hose.
Place two new hose clamps.
Install the T-piece with the extra connection pointing downwards.
Do not secure the hose clamps yet.

Installing the valve

3