3.5RL V6-3474cc 3.5L (2001)
4. Measure the resistance between the No. 3 and No. 4 terminals of the shift control solenoid valve/linear solenoid harness connector.
STANDARD: 4.0 - 6.0 Ohms (at 70°F, 20°C)
-
If the resistance is within specification, replace the transmission sub-harness.
-
If the resistance is out of specification, replace the linear solenoid.
5. If the resistance is within the standard, connect the No. 4 terminal of the shift control solenoid valve/linear solenoid harness connector to the
battery positive terminal, and connect the No. 3 terminal to the battery negative terminal. A clicking sound should be heard. If no clicking sound is
heard, replace the linear solenoid.
NOTE:
If the linear solenoid replacement is required, refer to:
-
Lower Valve Body
Removal/Installation
Disassembly/Reassembly
-
Throttle Valve Body/Linear Solenoid
Replacement