acura Workshop Repair Guides

Acura (Honda) Workshop Service and Repair Manuals

Panel Illumination Control Module > < Power Relay Test
Page 1
background image

Instrument Panel Relay: Testing and Inspection
Component Inspection

Check for continuity between the terminals.

-

There should be continuity between the No.1 and No.2 terminals when power and ground are connected to the No.3 and No.5 terminals.

-

There should be continuity between the No.2 and No.4 terminals when power is disconnected.

Gauge relay

Panel Illumination Control Module > < Power Relay Test