3.5RL V6-3474cc 3.5L (2001)
4. Measure the resistance between the No. 1 terminal of the shift solenoid valve/A/T clutch pressure control solenoid valve harness connector and
body ground, and between the No. 2 terminal and body ground.
STANDARD: 12 - 25 Ohms
-
If the resistance is within specification, replace the transmission sub-harness.
-
If the resistance is out of specification, replace the shift solenoid valves A and B.
5. If the resistance is within the standard, connect the No. 2 terminal of the shift solenoid valve/A/T clutch pressure control solenoid valve harness
connector to the battery positive terminal. A clicking sound should be heard. Connect the No. 1 terminal to the battery positive terminal. A
clicking sound should be heard. If no clicking sound is heard, replace the shift solenoid valves A and B.
NOTE: If solenoid valve replacement is required, see the following headings:
-
Lower Valve Body
Removal/installation
Disassembly/Reassembly
-
Shift Solenoid Valves A and B
Test
Replacement