acura Workshop Repair Guides

Acura (Honda) Workshop Service and Repair Manuals

End Play Inspection|Page 2322 > < Bolt Diameter|Page 2319
Page 1
background image

Connecting Rod: Testing and Inspection
End Play Inspection

Connecting Rod

-

If out-of-tolerance, install a new connecting rod.

-

If still out-of-tolerance, replace the crankshaft.

Push the crankshaft firmly away from the dial indicator, and zero the dial against the end of the crankshaft. Then pull the crankshaft firmly back
toward the indicator; dial reading should not exceed service limit.

Crankshaft

-

If end play is excessive, inspect the thrust washers and thrust surface on the crankshaft. Replace parts as necessary.

NOTE: Thrust washer thickness is fixed and must not be changed either by grinding or shimming.
Thrust washers are installed with the grooved sides facing outward.

End Play Inspection|Page 2322 > < Bolt Diameter|Page 2319