acura Workshop Repair Guides

Acura (Honda) Workshop Service and Repair Manuals

Fuel Tank Pressure Sensor > < Removal/Installation|Page 5201
Page 2
background image

3. Check for the readiness code with the scan tool.

EGR Monitor Code

NOTE:

-

Do not turn the ignition switch OFF.

-

When the battery negative cable is disconnected, all readiness codes are cleared.

1. Connect the scan to the Data Link Connector (DLC).
2. Start the engine and hold it at 3,000 rpm with no load (in Park or Neutral) until the radiator fan comes on.
3. Drive at a steady speed with the transmission in D5 position between 50 - 62 mph (80 - 100 km/h) for more than 10 seconds.
4. With the A/T in D5 position, M/T in 5th gear position, decelerate from 62 mph (100 km/h) by releasing the throttle completely for at least 5

seconds. If the engine is stopped, go to step 3 and do the procedure again.

5. Check for the readiness code with the scan tool.

Fuel Tank Pressure Sensor > < Removal/Installation|Page 5201