Integra (RS, LS) L4-1834cc 1.8L DOHC PFI (1995)
Valve Guide: Service and Repair
NOTE: Heat cylinder head to 300°F before removing or installing valve guides.
1.
Drive valve guide out of bottom of cylinder head using a suitable tool.
2.
Chill replacement guides in freezer for approximately one hour prior to installation.
3.
Using suitable valve guide installation tool, drive valve guide into place until tool bottoms.