Integra LS Coupe L4-1834cc 1.8L DOHC MFI (1997)
Heater Unit: Testing and Inspection
Heater Relay / Test
There should be continuity between the A and C terminals when power and ground are connected to the B and D terminals, and there should be no
continuity when power is disconnected.