acura Workshop Repair Guides

Acura (Honda) Workshop Service and Repair Manuals

A/T Clutch Pressure Control Solenoid Valve A and B Replacement|Page 5305 > < A/T Clutch Pressure Control Solenoid Valve A and B Replacement
Page 2
background image

13. Remove the bolt securing the harness cover (D) and disconnect the 4th clutch transmission fluid pressure switch connector (E).
14. Remove the A/T clutch pressure control solenoid valve A and B, ATF pipes (C) gasket (D) and O-rings (E).

15. Check the fluid passage of the A/T clutch pressure control solenoid valve for dust or dirt, and clean the passage.
16. Install the new solenoid valve body gasket on the solenoid valve cover, and install the ATF pipes with the filter end in the transmission housing.

Install the new O-rings over the ATF pipes.

17. Install A/T clutch pressure control solenoid valve A and B.
18. Secure the harness cover with the bolt.
19. Check the connectors for rust, dirt, or oil, clean, then connect the connectors securely.
20. Apply molybdenum grease to the bore hole of the synthetic resin bushing in the shift cable end, and attach the shift cable end to the control lever,

then insert the control pin into the control lever hole through the shift cable end, and secure the control pin with the spring clip/washer.

21. Secure the shift cable bracket with the nuts.
22. Install the battery base bracket and battery base.
23. Install the air cleaner housing and intake air duct.
24. Install the under-hood subfuse box on the battery base, and install the subfuse box on its bracket.
25. Install the battery tray, battery, battery cover, and battery hold-down bracket, then connect battery terminals.
26. Enter the anti-theft codes for the audio system and the navigation system (if equipped). Set the clock.
27. Do the steering column position memorization.
28. Do the power window control unit reset procedure.

A/T Clutch Pressure Control Solenoid Valve A and B Replacement|Page 5305 > < A/T Clutch Pressure Control Solenoid Valve A and B Replacement