NSX V6-3.0L DOHC (1991)
9.
At the 6-P receptacle in the control box, measure the voltage between terminal 4 and ground.
Is there about 5 volts?
Yes - Go to the next step. No - Replace the control box.[ ]
10.
With the DVOM set to ohms, check for continuity between terminals 2 and 4 of the 6-P receptacle.
Is there continuity between terminals 2 and 4?
Yes - Replace the switch module.[ ]
No - Go to the next step.
11.
Reconnect the 6-P connector to the control box and check for continuity between terminal 2 and ground.
Is there continuity?
Yes - Replace the switch module.[ ]
No - Replace the control box.[ ]