RDX L4-2.3L Turbo (2008)
5. Drying.After spraying primer surfacer, allow 7 to 10 minutes of drying time, then force dry it with infrared lamps or an industrial dryer.
6. Polishing.
-
Check that the primer surfacer has dried thoroughly, then sand the primer surfacer.
-
Use a double action sander and P400P600 disc sandpaper.
7. Intermediate coating and top coating.