RDX L4-2.3L Turbo (2008)
24. Install the oil pump.
25. Install the oil pan.
26. Install the cylinder head.
27. Install the drive plate.
28. Install the transmission.
29. Install the engine assembly.
NOTE: Whenever any crankshaft or connecting rod bearing is replaced, it is necessary after reassembly to run the engine at idle speed until it
reaches normal operating temperature, then continue to running it for about 15 minutes.