acura Workshop Repair Guides

Acura (Honda) Workshop Service and Repair Manuals

A/T Clutch Pressure Control Solenoid Valve A Test|Page 4247 > < A/T Clutch Pressure Control Solenoid Valve A Test|Page 4245
Page 4
background image

26. Check the connectors for rust, dirt, or oil, clean or repair if necessary, then connect the connectors securely.
27. Apply molybdenum grease to the hole in the bushing in the shift cable end. Attach the shift cable end to the control lever, then insert the control

pin into the control lever hole through the shift cable end, and secure the control pin with the spring clip/washer.

28. Secure the shift cable bracket with the nuts.
29. Install the intake air duct, the air cleaner housing, and the intercooler cover.
30. Install the battery base.
31. Install the battery tray, the battery, the battery cover, and the battery hold-down bracket, then reconnect the battery cables.
32. Enter the anti-theft codes for the audio system and the navigation system (if equipped). Set the clock (on vehicles without navigation).
33. Do the power window control unit reset procedure.

A/T Clutch Pressure Control Solenoid Valve A Test|Page 4247 > < A/T Clutch Pressure Control Solenoid Valve A Test|Page 4245