acura Workshop Repair Guides

Acura (Honda) Workshop Service and Repair Manuals

Emission Control Systems > < Variable Valve Timing Solenoid|Locations|Page 2361
Page 1
background image

Voltage Signal: Testing and Inspection

Alternator FR Signal Circuit Troubleshooting

1. Start the engine, and let it idle.

2. Monitor the ALTERNATOR in the DATA LIST with the HDS.

3. Check if the indicated percentage varies when the headlight switch is turned on.

Does the percentage vary?

YES -

The alternator signal circuit is OK. 

NO -

Go to step 4.

4. Turn the headlight switch OFF, then turn the ignition switch to LOCK (0).

5. Jump the SCS line with the HDS.

6. Disconnect the alternator 4P connector.

7. Disconnect PCM connector B (44P).

8. Check for continuity between PCM connector terminal B43 and body ground.

Is there continuity?

YES -

Repair a short in the wire between the PCM(B43) and the alternator. 

NO -

Update the PCM if it does not have the latest software  See: Testing and Inspection/Programming and Relearning/PCM Update, or substitute a
known-good PCM  See: Testing and Inspection/Initial Inspection and Diagnostic Overview, then recheck. If the symptom/indication goes away with a
known-good PCM, replace the original PCM  See: Engine Control Module/Service and Repair. 

Emission Control Systems > < Variable Valve Timing Solenoid|Locations|Page 2361