acura Workshop Repair Guides

Acura (Honda) Workshop Service and Repair Manuals

Control Module, A/T > < Shift Solenoid, A/T|Locations|Page 5096
Page 4
background image

24. Install new O-rings (E) on each solenoid valves.

NOTE: A new solenoid valve comes with new O-rings. If you install a new solenoid valve, use the O-rings provided on it.

25. Install shift solenoid valve D (black connector) by holding the shift solenoid valve body; make sure the mounting bracket contacts the accumulator

body.

NOTE: Do not hold the solenoid valve connector to install the solenoid valve. Be sure to hold the solenoid valve body.

26. Install shift solenoid valve A (black connector) by holding the shift solenoid valve body; make sure the mounting bracket contacts the accumulator

body.

27. Install shift solenoid valve C (brown connector) by holding the shift solenoid valve body; make sure the mounting bracket contacts the bracket of

shift solenoid valve A.

NOTE: Do not install shift solenoid valve C before installing shift solenoid valve A. If shift solenoid valve C is installed before installing shift
solenoid valve A, it may damage the hydraulic control system.

28. Install shift solenoid valve B (brown connector) by holding the shift solenoid valve body; make sure the mounting bracket contacts the

accumulator body.

29. Connect the YEL harness terminal to shift solenoid valve A, the GRN harness terminal to shift solenoid valve C, the RED harness terminal to shift

solenoid valve B, and the ORN harness terminal to shift valve D.

30. Install the shift solenoid valve cover, dowel pins, and a new gasket.
31. Install the new solenoid valve body gasket on the solenoid valve cover, and install the ATF pipes with the filter end in the transmission housing.

Install new O-rings over the ATF pipes.

32. Install A/T clutch pressure control solenoid valves A and B.
33. Secure the harness cover with the bolt.
34. Check the connectors for rust, dirt, or oil, clean or repair if necessary, then connect the connectors securely.
35. Apply molybdenum grease to the bore hole of synthetic resin bushing in the shift cable end, and attach the shift cable end to the control lever, then

insert the control pin into the control lever hole through the shift cable end, and secure the control pin with the spring clip/washer.

36. Secure the shift cable bracket with the nuts.
37. Install the battery base.
38. Install the air intake duct and air cleaner housing.
39. Install the battery tray, battery, and battery hold-down bracket, then connect the battery terminals.
40. Install the left upper fender cover and battery trim.
41. Enter the radio and navigation anti-theft codes, then enter the radio presets, and set the clock.
42. Do the steering column position memorization procedures.

Control Module, A/T > < Shift Solenoid, A/T|Locations|Page 5096