RL V6-3.7L (2009)
18. Secure the shift cable end with the nut (A).
19. Remove the 6.0 mm (0.24 in.) pin (B) that was installed to hold the shift lever.
20. Turn the ignition switch to ON (II). Move the shift lever to each position, and check that the A/T gear position indicator follows the transmission
range switch.
21. Allow all four wheels to rotate freely.
22. Start the engine, and check the shift lever operation in all shift lever positions.
23. Turn the engine off, shift into P, and check that the shift lock works properly. Push the shift lock release, and check that the shift lever releases.
24. Reinstall the center console. See: Body and Frame/Interior Moulding / Trim/Console/Service and Repair/Removal and Replacement/Center
Console Removal/Installation