RSX L4-2.0L (VTEC) (2002)
Door Lock Cylinder Switch: Testing and Inspection
Door Key Cylinder Switch Test
1. Remove the door panel.
2. Disconnect the 3P connector from the key cylinder switch.
3. Check for continuity between the terminals.
-
There should be continuity between the No.2 and No.3 terminals when the door key cylinder switch is in the LOCK position.
-
There should be continuity between the No.1 and No.2 terminals when the door key cylinder switch is in the UNLOCK position.