TL L5-2451cc 2.5L SOHC G25A4 FI (1995)
Ceiling Light Test (With Moonroof)
5. Check for continuity between the terminals in each switch position according to the table.
Ceiling Light Test (With Moonroof)
5. Check for continuity between the terminals in each switch position according to the table.